NEWS

Our latest news


STATIC LOAD TESTS IN LOCAL CARE CITY LAB ON PASSEIG DE LA MARINA DE MATARÓ.

Work related to instrumented static load tests - Deformations and stresses -, including monitoring with remote monitoring at night.

STATIC LOAD TESTS IN LOCAL CARE CITY LAB ON PASSEIG DE LA MARINA DE MATARÓ.


Once again, 3S'TECH successfully carried out static load tests applying the load with water in swimming pools. On this occasion the collaboration was made with the company Voracys S.L. for its client the Excellent City Council of Mataró.

On this occasion, it was necessary, due to the design of the test itself, to use new formats of collapsible swimming pools and to apply a specific protocol for filling them.

The total load applied was close to 60 Tn.

Due to the nature of the test itself, it was necessary to install continuous monitoring sensors for night control, incorporating warning signs, alerts and the application of an action protocol to respond to any setbacks. In this case, no specific action was necessary as very positive results were obtained in full compliance with the applicable regulations.

The collaboration with the Voracys construction staff was excellent, for which we thank the foreman - Mrs. Carlota - and the site manager - Mr. Jose.

Once the work was finished, a Technical Report of the results was drawn up, reflecting all the work carried out and the results obtained.



STATIC LOAD TESTS IN LOCAL CARE CITY LAB ON PASSEIG DE LA MARINA DE MATARÓ.
STATIC LOAD TESTS IN LOCAL CARE CITY LAB ON PASSEIG DE LA MARINA DE MATARÓ.
STATIC LOAD TESTS IN LOCAL CARE CITY LAB ON PASSEIG DE LA MARINA DE MATARÓ.
STATIC LOAD TESTS IN LOCAL CARE CITY LAB ON PASSEIG DE LA MARINA DE MATARÓ.

STATIC LOAD TESTS IN LOCAL CARE CITY LAB ON PASSEIG DE LA MARINA DE MATARÓ.
STATIC LOAD TESTS IN LOCAL CARE CITY LAB ON PASSEIG DE LA MARINA DE MATARÓ.
STATIC LOAD TESTS IN LOCAL CARE CITY LAB ON PASSEIG DE LA MARINA DE MATARÓ.


Back